Washington Bridge demolition paused to preserve lawsuit evidence
"The engineers for RIDOT, in cooperation with the state’s legal team, have reached the point in the demolition of the Washington Bridge where work must be paused to preserve evidence for the legal case," the response said. "The goal is to be able to continue demolition as swiftly as possible while ensuring important evidence is preserved."